     The photos below show the major developments of the Laoag CityJail undertaken during the administration of JS/INSP ROQUE CONSTANTINO A SISON III.


1. Construction of the Receiving Room, Search Room, Medical and Supply Room and Rest Room














2. Construction of a new septic tank for the new Rest Room



3. Completed elevation of the perimeter wall bordering the City Jail and the City Engineering Office which was considered a security risk for a very long period of time and installation of lampposts with daylight bulbs to illuminate the area during night time.






4. Construction of cemented bench at the driveway that serves as waiting area also



5. Replacement of old jetmatic pump and motor pump



6. Construction of a drainage canal at the back portion of the jail



7. Replacement of old and defective electrical outlets inside the cells



8. Replacement of the brake system of the old prisoner's van



9. Siphoning of all existing tanks inside the cells






10. Construction of a new flag pole